Performing Arts Centre
Manly West State School Performing Arts Centre was officially opened on the 6 September 2011 and was funded through the Australian Government's Building the Education Revolution (BER) school infrastructure program. The Performing Arts Centre cost $2 650 000 to build and is fitted out with modern sound system and computer operated light system. The hall also has tiered retractable seating, a 10 metre by 6 metre stage with front curtain and dressing rooms.
Features
- Canteen area – fridge, oven, hotbox, microwave and urn
- Toilets
- 2 dressing areas
- Loading bay to back stage
- Computer programmable lighting system (Clarity)
- LED any colour, Dimmers and fixed spotlights
- 3 stage lighting bars and one front of stage
- Large sound system
- Seating for 400
- Tiered seating at the back
- Stage Curtains
- Projector and stage screen
- Talk back system
- Hearing impaired system
- 24 track mixing desk
- Range of mics including 10 head set radio mics
- Stage 10m wide x 6m deep
Contact the school for hire information.